Rich application cases Enable Aerospace Kaitian to handle various application scenarios with ease

scroll down

Category :

Water Environment Governance

Key word :

Aerospace Kaitian Environmental

Water Environment Governance

The in-situ ecological restoration and governance project of the flood interception channel in Xiegang Town, Dongguan City


17524 ㎡

3500 ㎡/d

This project is located in Xiegang Town, Dongguan City. It includes an artificial wetland advanced treatment system and is equipped with ancillary facilities such as river water inlets and outlets, grilles and lift pumping stations. The total construction area of the project is 17,524 square meters, with a construction scale of 3,500 cubic meters per day. The treatment process adopts a multi-level segmented treatment of "ecological ponds + two-stage vertical flow wetlands + natural wetlands". The effluent quality of the system is stable and meets the Class V (river) standard stipulated in the "Surface Water Environmental Quality Standards" (GB3838-2002).