Rich application cases Enable Aerospace Kaitian to handle various application scenarios with ease

scroll down

Category :

Water Environment Governance

Key word :

Aerospace Kaitian Environmental

Water Environment Governance

The Zero Discharge Treatment Project of Mine Water in Haizetan Coal Mine


Treatment capacity: The total treatment water volume is 1,350 cubic meters per hour, with a planned area of 41.55 mu. The equipment supplied for each process section can still operate normally and meet the water quality requirements even when the water quality fluctuates by 10%. Design the inlet and outlet water quality: After treatment, it is reused for the production and domestic water use of the mine, and the excess water is transported to Jingbian Energy and Chemical Industry Park for comprehensive utilization. The final products: The products of the membrane concentration process are product water and concentrated brine. After evaporation and crystallization of the concentrated brine, the products are qualified product water and crystalline salt.